7 Replies Latest reply on Nov 10, 2018 11:21 PM by Shinichiro Murakami

    Line graph not connecting consecutive data points

    Jerry Lin

      I've got a graph of travel times vs. the time of day. When I graph the points individually, it looks like this:

      Screen Shot 2018-11-10 at 4.17.27 PM.png

      Then, when I turn the "MINS" into a  sum to get a line graph, I get this:

      Screen Shot 2018-11-10 at 4.17.06 PM.png

       

       

      The line graph isn't quite correct; the graph should connect consecutive time points, even if there is a large gap in the travel time (y-axis). Do you know what I should do to make the line graph connect consecutive points instead of skipping around? Thanks!