    Gant Chart

    Marvin Rosian

      Hello everybody,

       

      i am struggling with my Gant Chart and i hope that someone can help me.

      In the attached Sheet "Timeline" i made a Gant Chart where a tool number has three different Loops with a specific start-date (Sampling Planned) and end-date (Evaluation Panned) per Loop. The problem is, that loop 2 and loop 3 should not start with their start-date, but with the end-Date from the previous loop ( a continious Gant Chart). Unfortunately i am not able to connect End-Dates from different loops (or any dates from different loops)... Can someone help me with that issue?

       

      Tableau version 2018.2.0

       

       