2 Replies Latest reply on Jun 7, 2018 9:08 PM by Peter Fakan

    Switch between different date types

    Roisha Pal

      Hi Guys,

       

      I have 4 different dates in my application, scan date, posted date, due date, I wanted to know how many invoices by scan date, by posted date.

      I want a logic in such a way if user select scan date then calculation should be based on scan date, if posted date then based on posted date. how to do that?