2 Replies Latest reply on Aug 10, 2017 3:44 PM by Yuriy Fal

    How to force a connection between data points on a line chart

    William Alden

      Hello, I am trying to figure out how to connect two points on a graph that for some reason are not connecting automatically. The Graph is displaying two different metrics data ( the blue line is one metric, Red and green should be single line as they are one metric). I am using the same calculated field to bring in both lines. However I have not target data for the blue line so it shows as null which i make blue. How can i arrange this so it will pull both metrics but maintain target lines and conditional formatting for the red/ green line?  

       

      Connect.PNG