      Hi All,

      I am having issues with creating a trellis chart in the attached data set. I've gone through a few articles and examples trying to reverse engineer what was already out there, but there is still something breaking.  I based all of the calculations off of the article by Andy Cotgreave (https://interworks.co.uk/blog/panel-charts-in-tableau/ )

       

      When I try to create the calculation on my campaign dimension, it breaks and multiple campaigns show up inside of each panel, therefore it makes looking at the continuity hard.  I've tried doing this as well as a pie chart by campaign with the call result dimension on color, but still had the same issue.   Is there something that needs to be changed in the table calc?

       

      Thanks,Eric