1 Reply Latest reply on Sep 26, 2016 12:44 PM by Benjamin Greene

    How to use different calculated field based on date

    Peter Bova

      Hello,

       

      I need to calculate a performance metric where the logic for the calculated field changed on September 1st. I would like to continue to calculate this metric to show the trend, but I'm not sure how to allow continuity in the metric this way. Is there a way to use one calculated field until 9/1 and another calculated field after 9/1, such that there is no break in the table?

       

      Thanks!