2 Replies Latest reply on Apr 23, 2013 10:36 AM by Tracy Rodgers

    Line Chart Over bar Chart using 3 measure values

    ravi.vankayala

      Hi,

       

      how to get linechart over barchart using 3 measure values? I know if we have 2 measures we can achieve this using dual axis and change the mark type for one measure value but when we have 3 measure values linechart is not showing above graph chart.

       

      I am attaching the screen shots with 2 measure values and 3 measure values.

       

      I want to create a linechart over barchart like attached 3rd image ("Required barchart with 3 measure values.jpg)