    Workday Duration Calculations

      I am trying to figure out a way to calculate durations between two dates in terms of the number of work days expressed full and fractional days, i.e.if the duration is 2 work days plus 4 hours, I'd like this expressed as 2.5 work days.  I have tried a bunch of ways to calculate the fraction portion of this figure and I just can't figure out a way.  I've attached a file with a sample of my data - the calculation needs to be made between "Open Date and Time" and "Close Date and Time".  Ultimately I want to calculate averages and trends for these durations.  The data in the file comes from Excel, and I could use Excel as an intermediary, but ideally I would like to attach directly to the data in a SQL database so the data can stay current, therefore, the calculations need to be done directly against data stored in a date/time format in SQL.  Any ideas?  Thanks in advance for your help.