1 Reply Latest reply on May 11, 2015 11:20 PM by kaifeng zeng

    Tabjolt

    alamelumangai.venkatavaradachari

      Inorder to test multiple workbooks, is it possible to provide them all in the vizpool.csv? does the tool work that way?

       

      How does the user load distributes in that case?

       

      If this is not possible what is a recommendation that can accommodate the load testing of multiple workbooks at the same time?