    I will build up a waterfall with 4 steps (the data of each step are independend)

    hans-jost.vonweyhe

      I will build up a waterfall with the start year parameter (e.g. 2012) and the end year parameter (e.g.2030)

       

      • The first step is the installed capacity by e.g. 2012: in the database
      • the second step are the retirements: this value is the sum of retirements by the year 2012 until the end (year-1) 2029
      • the 3rd step are the additional capacity ((installed capacity 2030 --> last bar) - (installed capacity 2012 --> first bar) + (all retirements between 2012 and 2029 --> second bar)
      • the last bar is the installed capacity by e.g. 2030: the data is find in the database

      see also test data as attach

       

      Do you have any Idea to bring up these 4 bars in a "virtual" dimension to build up a waterfall by the GANTT - Chart mechanism.

       